EnergieLive.ro | Subscribe to Newsletter                                                                                                                                         Romanian Energy Market 360' - Business Intelligence
Banking
EUR = 4.517 USD = 3.296 XAU = 139.952
AUD = 2.966 CAD = 2.953 CHF = 3.702
>Translate this page:  

Energie eoliana

01:25 / 07-10-14
Capacitățile de producere a energiei din surse regenerabile au ajuns la o putere instalată totală de 4.704 MW la finele lunii august a acestui an, potrivit datelor furnizate de Transelectrica. Astfel, în sistem existau proiecte eoliene cu o putere de 2.800 de MW, parcuri fotovoltaice cu o capacitate totală de...
00:53 / 30-09-14
GE (NYSE: GE) a anuntat alegerea programului GE Wind PowerUp* de catre operatorii europeni de ferme eoliene ENERTRAG AG si Grupul Monsson pentru fermele eoliene din Germania si Romania. Programul PowerUp, o solutie GE Predictivity, permite operatorilor de ferme eoliene sa isi creasca productia energetica anuala (PEA) cu pana la...
00:39 / 24-09-14
Availon, the leading independent wind turbine O&M service provider, announced that it has passed the 1,000MW milestone for servicing Vestas turbine technology. This achievement underpins Availon’s unmatched expertise in Vestas technology in the market of independent O&M service providers. Availon has started providing O&M services for Vestas turbines in 2009....
03:22 / 11-09-14
Ministerul german al Mediului a anunțat joi că va finanța cu 3,9 milioane de euro construcția un parc eolian ce urmează a fi construit în Pădurea Craiului, în apropiere de satul Tomnatic, din nord-vestul României, informează un comunicat de presă. Cele patru turbine eoliene, fiecare cu o capacitate de 2,5...
17:08 / 09-06-14
Tranziția Europei spre un sistem energetic bazat pe energiile regenerabile a înregistrat progrese atât de mari încât ar putea fi posibil ca instalațiile regenerabile să fie oprite din cauza supraproducției, transmite Bloomberg. Creșterea de cinci ori înregistrată la producțiile de energii verzi în Europa în ultimul deceniu a condus la...
07:48 / 07-04-14
Mai multe fonduri de pensii și-au arătat interesul de a achiziționa o participație în parcul eolian de la Fântânele-Cogealac deținut de CEZ, estimat la 1,1 miliarde de euro (1,5 miliarde de dolari), a declarat joi Tomas Pleskac, directorul diviziei de operațiuni străine al celei mai mari companii de utilități din...
20:40 / 17-03-14
Comitetul de reglementare al Autorității Naționale de Reglementare în domeniul Energiei (ANRE) a aprobat, în ședința din 12 martie, acordarea de autorizații pentru înființarea a două noi parcuri eoliene, potrivit unui document postat pe site-ul instituției. Proiectele de producere a energiei din surse regenerabile au ajuns la o capacitate totală...
13:36 / 12-03-14
Schimbările care au survenit în ultimul an, în legătură cu energia produsă din surse de energie regenerabilă, au creat nesiguranţă şi instabilitate în ceea ce priveşte noile investiţii în domeniu. Măsura amânării certificatelor verzi până în anul 2018, va crea inflaţie pe această piaţă şi va plasa factorul de decizie,...
17:30 / 27-01-14
Producția de energie regenerabilă a ajuns la un nivel-record la finele anului trecut, când capacitatea totală a proiectelor existente în sistem a ajuns la 4.255 de MW, cu 82% mai mare decât la sfârșitul anului 2012, potrivit datelor Autorității Naționale de Reglementare în Energie (ANRE). Astfel, la 31 decembrie 2013,...
13:35 / 06-01-14
Producția de energie regenerabilă a ajuns la un nivel-record la finele anului trecut, când capacitatea totală a proiectelor existente în sistem a depășit 3.757 de MW, cu 60% mai mult decât la sfârșitul anului 2012, potrivit datelor furnizate de Transelectrica. Astfel, în primele 11 luni din 2013 au fost instalate...
09:50 / 20-12-13
Local unemployed people are benefiting from new Careers in the Offshore Wind industry following their successful completion of a newly developed qualification offered by Maersk Training in Newcastle, designed to help them take advantage of job opportunities in the thriving UK offshore wind energy sector. Following the success of a...
20:39 / 15-12-13
Capacitatea centralelor de producere a energiei din surse regenerabile era, la finele lunii octombrie, de 3.670 de MW, cu 60% mai mare decât era la începutul acestui an, când în sistem figurau 2.334 de MW, potrivit datelor Transelectrica. Cel mai mare avans l-au avut panourile fotovoltaice, care au ajuns la...
16:16 / 05-12-13
Martifer Solar, o sucursală a Martifer SGPS, a finalizat construirea a două centrale fotovoltaice în România, totalizând 5.41 MWp, pentru Eurowind Energy A/S. Firma a fost responsabilă pentru ingineria, achiziţia şi construirea a două proiecte, o centrală de 2.03 MWp în Halchiu, Judeţul Braşov şi o altă centrală de 3.38...
02:01 / 28-11-13
“La o medie de 2,3 MW pe turbină ajungem la circa 1.100 turbine eoliene. Dar se poate judeca şi altfel: 1 MW instalat este în jur de 1 million de euro, astfel că 2.500 MW înseamnă 2,5 miliarde euro. Până la 4 miliarde de euro (valoarea investiţiilor totale în eoliene...
18:15 / 10-11-13
Consumul de electricitate era, până acum, un vector important care ne arăta evoluţia economiei româneşti, dar iată că din acest an dependenţa dintre cei doi indicatori a luat sfârşit: chiar dacă economia este pe plus şi ne aşteptăm să terminăm anul cu o creştere a PIB-ului de 2,2% faţă de...
07:02 / 17-10-13
Firma de automatizări industriale Digitech Electric din Bucureşti vrea să breveteze la nivel internaţional o turbină eoliană sferică, dar are nevoie de subvenţii pentru a reduce costurile de producţie, a declarat miercuri directorul general al Digitech Electric, Cătălin Silviu Călin. “Este o turbină care nu face zgomot, deci se pretează...
07:00 / 16-10-13
România se află pe locul 10 în Uniunea Europeană din punctul de vedere al producției de energie eoliană, au declarat miercuri, într-o conferință de presă, reprezentanții Asociației Patronale Surse Noi de Energie – SunE. ‘În acest moment, în UE sunt instalate turbine eoliene cu o capacitate totală de 106.000 MW....
10:00 / 07-10-13
Centralele eoliene au produs în primele opt luni din acest an 2,9 TWh de electricitate, iar hidrocentralele au ajuns la o producție de 10,8 TWh, potrivit datelor publicate luni de Institutul Național de Statistică. Astfel, cantitatea totală de energie din surse regenerabile produsă în perioada analizată a ajuns la 13,7...
15:00 / 16-08-13
Comitetul de reglementare din cadrul Autorităţii Naţionale de Reglementare în domeniul Energiei (ANRE) a aprobat în şedinţa din 14 august 2013, autorizaţii de înfiinţare pentru opt proiecte de producere a energiei din surse fotovoltaice şi pentru două parcuri eoliene, potrivit unui document postat pe site-ul instituţiei. În luna iulie 2013,...
14:00 / 14-08-13
BERD analizează un împrumut de 68 milioane de euro pentru construcţia şi funcţionarea unui parc eolian de 108 MW dezvoltat de compania germană STEAG în judeţul Constanţa, costurile totale ale proiectului fiind estimate la până la 192 milioane de euro. Restul finanţării va fi asigurat de STEAG şi alte instituţii...
12:00 / 22-07-13
Peste 90 la sută din fondurile europene gestionate de Ministerul Energiei au fost contractate, cele mai multe din proiectele din acest domeniu vizând generarea de energie fotovoltaică şi eoliană, în timp ce proiectele de generare a energiei pe bază de biomasă sunt mai puţine, spune Constantin Niţă. “La Axa 4...
16:00 / 19-06-13
România va avea un Plan Naţional dedicat achiziţiilor publice verzi pentru promovarea tehnologiilor curate, iar în perioada următoare cel mai nou parteneriat privind acest tip de achiziţii, semnat cu Centrul pentru Politici Durabile Ecopolis, se va transforma într-un act normativ, a declarat, joi, într-o conferinţă de presă, Rovana Plumb, ministrul...
14:02 / 18-06-13
Facturile la energie ar putea scădea cu 5 – 10%, de la 1 iulie, pentru consumatorii casnici, a declarat, marţi, într-o conferinţă de presă, ministrul delegat pentru Energie, Constantin Niţă. “De la 1 iulie, ar trebui să fie un impact în factură, ca urmare a noii legi. ANRE trebuie să...
13:18 / 13-06-13
Agricultura, industria de prelucrare a produselor agro-alimentare, energia verde şi industria petrochimică sunt domenii-cheie pentru dezvoltarea relaţiilor bilaterale dintre România şi Egipt, identificate la Forumul de afaceri româno-egiptean.  În cadrul sesiunii oficiale a Forumului, au fost subliniate interesul celor două părţi pentru dezvoltarea colaborării bilaterale, complementaritatea celor două economii, potenţialul...
20:26 / 11-06-13
O nouă staţie va conecta un parc eolian de 84 MW la reţeaua naţională de transport al energiei. Încă din anul 2000, 353 gigawatt (GW) energie regenerabilă au fost instalaţi în Uniunea Europeană (UE), 28% din acest total provenind din energia eoliană. Acest lucru înseamnă că până în anul 2012...
16:12 / 10-06-13
Ordonanţa de urgenţă privind sprijinul pentru energia regenerabilă a fost publicată în Monitorul Oficial fără prevederea din proiectul de act normativ prin care marii consumatori de electricitate erau scutiţi de plata a 50% din certificatele verzi, aceştia urmând să fie exceptaţi doar după avizul CE. Proiectul de OUG care a...
09:00 / 07-06-13
După o fază de dezvoltare de peste patru ani şi o perioadă de construcţie de aproximativ un an, VERBUND, liderul pe piaţa de electricitate din Austria, pune în funcţiune unul dintre cele mai mari parcuri eoliene onshore din Europa în apropierea coastei Mării Negre. Aproximativ jumătate din parcul eolian de...
12:55 / 06-06-13
Fie vorba de energie solară, bioenergie sau energie eoliană – Europa investește în surse de energie regenerabilă. Obiectivul comun al UE: până în 2020 ponderea de energie din surse regenerabile să fie de 20%. Pentru aceasta este nevoie de tehnologii și servicii noi. Progresele din domeniul energiilor regenerabile sunt prezentate...
22:38 / 04-06-13
Ordonanţa de urgenţă pentru stabilirea sistemului de promovare a producerii energiei din surse regenerabile a fost adoptată, marţi, de Guvern, în actul normativ fiind prevăzut că recuperarea certificatelor verzi se va face începând cu 31 martie 2017 pentru centralele hidro şi solare, respectiv începând cu 1 ianuarie 2018 pentru centralele...
20:38 / 04-06-13
Guvernul a decis ca, din 1 iulie, să fie amânată acordarea unei părţi din certificatele verzi către investitorii în microhidrocentrale, centrale eoliene şi fotovoltaice, măsura urmând să fie valabilă până în martie 2017, pentru centralele hidro şi solare, şi până în 2018, pentru centralele eoliene. Amânarea a fost decisă prin...
15:36 / 03-06-13
România este cea mai necompetitivă ţară din UE din cauza preţului la energia electrică şi a făcut “o prostie” atunci când a introdus certificatele verzi, care permit recuperarea investiţiilor în energia regenerabilă în numai doi ani, potrivit ministrului pentru Societatea Informaţională, Dan Nica. “Proprietarul ArcelorMittal, Lakshmi Mittal, a venit şi...
20:00 / 29-05-13
Săptămâna viitoare, în şedinţa de Guvern, va fi aprobată Ordonanţa privind modificarea şi completarea Legii 220/2008 pentru stabilirea sistemului de promovare a producerii energiei din surse regenerabile, a declarat, miercuri, într-o conferinţă pe teme de energie, Constantin Niţă, ministrul delegat pentru Energie.  “Schema de sprijin este cea mai generoasă din...
19:05 / 28-05-13
Ministrul delegat pentru Energie Constantin Niţă şi ministrul Mediului Rovana Plumb vor participa, miercuri după-amiază, alături de toţi cei implicaţi în domeniul energiei, la conferinţa “Mediafax Talks about Energy”, care va avea loc la Hotel Radisson Blu, Sala Atlas, începând cu ora 15.00. La conferinţă vor mai fi prezenţi ca...
20:37 / 23-05-13
Comisia Europeană a fost, “în mare”, de acord cu propunerile României privind modificarea legislaţiei în sectorul producţiei energiei regenerabile, care însă nu presupun înjumătăţirea numărului de certificate verzi, ci doar “o amânare”, a declarat ministrul delegat pentru Energie, Constantin Niţă. “Comisia Europeană a apreciat că legea a fost în dezbatere,...
11:00 / 21-05-13
Summitul liderilor UE pe tema energiei va răspunde unui obiectiv multiplu – garantarea unor tarife acceptabile pentru consumatori, reducerea taxelor la importuri şi asigurarea unei producţii interne permanente. “Europa riscă să devină singurul continent care depinde de energia importată. În anul 2035, dependenţa energetică va depăşi 80%, iar acest lucru...
17:16 / 20-05-13
Numărul certificatelor verzi tranzacţionate în prima sesiune din mai 2013 pe Piaţa Centralizată a Certificatelor Verzi s-a ridicat la 113.623 unităţi, conform datelor publicate de operatorul pieţei de energie OPCOM. În prima sesiune din mai au fost lansate opt oferte de cumpărare şi 61 de vânzare. Preţul de închidere a...
22:38 / 09-05-13
Situaţia dificilă în care se află Complexul Energetic Oltenia (CEO) şi nerezolvarea problemelor existente ar putea conduce la momente economice extrem de dificile, în condiţiile în care, în ultima perioadă, complexul întâmpină mari greutăţi financiare cauzate de consumul scăzut de energie produsă pe bază de cărbune. Managerul complexului, Laurenţiu Ciurel,...
15:48 / 06-05-13
Bula speculativă din domeniul energiei regenerabile va exploda în perioada următoare, interesul pentru sectorul energiei eoliene începând deja să scadă, a declarat, pentru AGERPRES, Codrin Matei, managing partner Investment Banking Division în cadrul Crosspoint. ‘Piaţa de energie va urma într-o oarecare măsură cursul pieţei imobiliare şi estimez că această bulă...
13:00 / 23-04-13
RENEXPO® SOUTH-EAST EUROPE, cel mai mare și important târg pentru energie regenerabilă și eficiență energetică din România, își prezintă cea de-a VI-a ediție, între 20-22 noiembrie 2013 în noua sa locație, cel mai modern centru expozițional din România: EXPOROM, București. Din 2008, RENEXPO® oferă platforma ideală pentru afaceri de succes...
11:00 / 23-04-13
Ministerul Economiei a semnat, luni, 11 contracte pentru cofinanţarea din fonduri europene în valoare de 670 milioane de lei a unor proiecte de eficientizare a consumului de energie şi pentru producţia electricităţii din surse regenerabile. Printre beneficiari se numără companiile Chimcomplex Borzeşti, Elsid Titu, Soceram, Electrocarbon, acestea urmând să deruleze...
12:00 / 15-04-13
Cel mai mare producator de turbine eoliene la nivel mondial, grupul danez Vestas, va livra, in a doua jumatate a acestui an, 36 de turbine eoliene cu o capacitate totala de 72 MW, pentru un proiect al Lukerg Renew, in judetul Tulcea, potrivit unui comunicat al companiei daneze, citat de...
12:59 / 05-04-13
Reducerea numărului de certificate verzi va fi aplicată doar în cazul producătorilor de energie regenerabilă care vor intra pe piaţă din 2014, iar suspendarea acordării unor certificate va fi operată numai în cazul companiilor care produc deja energie alternativă, spune un director din ANRE. Ministerul Economiei propune Guvernului, printr-un proiect...
12:24 / 20-03-13
LEITWIND announced today that its new state of the art 4Q frequency converter, known as LeitDrive, was now to be installed across all of its wind turbine product range, after successful testing demonstrated the prototypes’ superior performance. LeitDrive is one of the most remarkable innovations resulting from LEITWIND’s continuous direct...
15:32 / 19-03-13
Un număr de 27 de parcuri eoliene vor fi date în exploatare în judeţul Vaslui, până la sfârşitul anului 2015, valoarea totală a investiţiilor ridicându-se la 100 de milioane de euro, se arată într-un raport întocmit de Consiliul Judeţean. Potrivit unui raport întocmit de Consiliul Judeţean (CJ) Vaslui, un număr de...
11:32 / 04-03-13
The Switch, a Finland-based supplier of permanent magnet generator (PMG) and full-power converter (FPC) packages, announced today that its first 5 MW high-speed drive trains installed in the field in China for CSIC (Chongqing) Haizhuang Windpower Equipment Co., Ltd (HZ Windpower), a Chinese wind power equipment manufacturer, are now successfully...
15:53 / 01-03-13
Grupul ceh de utilităţi CEZ a decis să-şi reducă cu două treimi planurile vizând construcţia de noi parcuri eoliene în România, din cauza incertitudinilor privind certificatele ecologice, dar şi ca urmare a creşterii necesităţilor de finanţare pentru proiectele din Cehia, informează Bloomberg. Până în 2016, CEZ intenţionează să construiască în...
16:59 / 28-02-13
Availon, one of the the leading multi-brand provider of WTG maintenance services, announced today that it signed a new full service contract for three wind farms in Germany with NIBC European Infrastructure Fund  (NEIF). The projects were built with 19 VESTAS V80 2.0 MW wind turbines, with a total installed capacity of 38MW,...
15:00 / 19-02-13
Factura la energia electrică ar putea creşte, în 2013, cu 12 euro pentru fiecare Megawatt/oră, autorităţile punând această scumpire pe seama energiei alternative, când, de fapt, regenerabilele n-ar duce decât la un tarif mai scump cu numai 2 euro/MWh, restul fiind subvenţie ascunsă în beneficiul unităţilor termo, ‘pe care le...
10:21 / 11-02-13
Leitwind announced today the commissioning of the Deliceto wind farm, which is now grid-connected and operating in Apulia, Italy. Leitwind was contracted by Elce Energia Spa in 2012 to build the 24MW Deliceto wind farm, which is made of 16 Leitwind’s patented LTW80 1,5MW gearless turbines. The wind turbines were...
14:00 / 07-02-13
Energia eoliană din centrul şi estul Europei va deveni o sursă semnificativă de producere a energiei electrice până în 2020, iar capacitatea Turciei de generare a energiei eoliene se va mări considerabil – cu condiţia de a avea un cadru legal stabil în fiecare ţară, se arată într-un raport publicat...
15:00 / 06-02-13
Compania americană General Electric (GE) a încheiat cu firma Energia Verde Ventuno din Bucureşti, cu acţionariat italian, un contract de 30 milioane de dolari pentru livrarea a şapte turbine eoliene de 17,5 MW şi servicii de mentenanţă. Turbinele vor fi instalate în localitatea Cerna, judeţul Tulcea, şi vor asigura alimentarea...
14:00 / 06-02-13
Compania spaniolă de construcţii Copisa şi-a adjudecat contractul pentru construirea unui parc eolian la Chirnogeni, în judeţul Constanţa, informează un comunicat de presă. Proiectul are o valoare de 8 milioane de euro, iar lucrările vor avea loc timp de cinci luni şi presupun instalarea a 32 de generatoare de aer...
11:10 / 21-01-13
ArcelorMittal Galaţi intenţionează să îşi crească prezenţa pe piaţa românească de turbine eoliene prin adaptarea producţiei la cerinţele acestei industrii, precum şi prin îmbunătăţirea calităţii serviciilor şi a termenelor de livrare pentru clienţii săi, a anunţat, joi, directorul de comunicare al combinatului, Dorian Dumitrescu. Potrivit acestuia, în prezent, ArcelorMittal Galaţi...
16:12 / 18-01-13
România ar putea atrage noi investitori interesaţi să investească în parcuri eoliene în 2013 şi 2014, ca urmare a stimulentelor guvernamentale, potrivit Monsson Group, cel mai mare dezvoltator de parcuri eoliene din România, transmite Bloomberg. Compania privată Monsson are în România un portofoliu de proiecte eoliene cu o capacitate totala...
12:32 / 18-01-13
Availon GmbH, a cross-brand provider of wind turbine generator (WTG) services, has signed a major contract with the Japanese firm EOS Engineering & Service Co., Ltd. for the supply of 80 grid coupling contactors. A subsidiary of Japan Wind Development Co., LTD, which was founded in 1999, EOS Engineering &...
16:25 / 04-01-13
Preşedintele Schneider Electric România, Saulo Spaolanse, consideră că România are un potenţial foarte ridicat în sectoarele de energie eoliană şi solară, ţara noastră fiind o piaţă foarte importantă pentru companie, care are planuri pe termen lung. În plus, tot mai multe companii şi persoane fizice devin conştiente de necesitatea reducerii...
14:30 / 06-12-12
Vor avea o capacitate totală de 90 MW, suficient pentru a genera aproximativ 400 GWh anual Enel Green Power („EGP”), prin subsidiara sa, Enel Brasil Participacoes, a demarat lucrările de construcție la trei parcuri eoliene în statul brazilian Bahia. Cele trei parcuri, numite „Cristal”, „Primavera” și „Sao Judas”, sunt localizate...
14:17 / 05-12-12
Targul Romaniei pentru Energii Regenerabile, organizat de R.E.S. Group, a inregistrat un succes notabil in cadrul celei de-a  III-a editii  RoEnergy Timisoara 2012. Nici un eveniment din vestul tarii nu a starnit vreodata un asemenea interes fata de energii regenerabile, asa cum a facut-o RoEnergy Timisoara 2012, pe parcursul celor...
14:21 / 03-12-12
A new anti-corrosive coating with a drying time of just 60 minutes promises to increase line-speeds for wind tower manufacturers by at least 50 per cent compared to standard two and three-coat systems. Launched today by international coatings manufacturer Hempel, Hemperea DTM 55973 can be applied directly to metal and...
15:07 / 26-11-12
Ultima dintre cele 240 de turbine eoliene din Parcurile Eoliene Fântânele-Cogealac din România a fost conectată joi la reţea, capacitatea totală instalată ajungând la 600 MW, se arată într-un comunicat al CEZ România, remis, joi, AGERPRES. În aceste condiţii, potrivit companiei, cel mai mare parc eolian continental din Europa poate...
11:29 / 14-11-12
Luxemburg, noiembrie 12, 2012 – Fondul Marguerite a anunţat astăzi achiziţionarea unui pachet de acţiuni de 50% în parcul eolian Chirnogeni (80MW) din Romania, de la dezvoltatorul de naţionalitate cipriotă EP Global Energy, care va rămâne acţionar cu un pachet de 20% din acţiuni. Proiectul, care este pe punctul de...
09:41 / 06-11-12
RoEnergy Timisoara 2012, care se va desfasura in perioada 28-30 noiembrie 2012, la Pavilion Expovest, Calea Lugojului, 7, reuneste companii de pe trei continente:  Europa, Asia și SUA. Prin tematica, evenimentul acopera energia solara, bioenergia, energia eoliana, microhidroenergia, eficienta energetica, infrastructura energetica. Dintre companiile care vor fi prezente la RoEnergy,...
20:32 / 18-10-12
The 3rd annual Wind Power Romania Conference is set to be a SELL-OUT. The leading event in the market place now atrracts more than 400 decision making attendees, including elite board level buyers and financiers. The who’s who of the wind industry meet here because it attracts the very people who sign the cheques. NEW REVAMPED...
17:29 / 13-10-12
Parcul eolian din România este cel mai mare din Europa, cu o capacitate record de 540 MW, după ce o nouă turbină eoliană a fosta conectată joi la reţea, potrivit unui comunicat de presă al grupului de utilităţi ceh CEZ difuzat de CTK. ‘Parcul eolian este cel mai mare proiect...
16:39 / 13-10-12
Tăierea subvențiilor acordate pentru producerea de energie din surse regenerabile, într-o serie de state europene, cum sunt Italia, Bulgaria ori Germania, face ca mari companii occidentale să-și caute noi țări pentru investitii.  O zonă cu potențial RES de excepție este jumătatea vestică a țării, având epicentrul în Banat, locul de...
16:29 / 13-10-12
PROKON placed another order with The Switch for 10 units of direct-drive 3 MW permanent magnet generator (PMG) and full-power converters (FPC). This contract follows a previous one for 2 direct-drive prototypes in the same class that will be ready for testing by the end of 2012. These orders strengthen...
14:36 / 13-10-12
Parcul eolian din România este cel mai mare din Europa, cu o capacitate record de 540 MW, după ce o nouă turbină eoliană a fosta conectată joi la reţea, potrivit unui comunicat de presă al grupului de utilităţi ceh CEZ difuzat de CTK. Grupul CEZ a cumpărat în 2008 proiectul...
11:38 / 28-09-12
By Pierre Tardieu, Co-Chair of the Policies and Markets track at EWEA 2013 Some wind energy markets across Europe are experiencing damaging changes to their national support schemes which are counterproductive since they set back the prospect of renewables being able to compete without support in the near future. VIDEO:...
22:04 / 27-09-12
The European Union has passed the milestone of 100 gigawatt (GW) of installed wind power capacity, according to the European Wind Energy Association (EWEA). 100 GW of wind power can generate electricity over a year to meet the total consumption of 57 million households, equivalent to the power production of...
21:27 / 27-09-12
Sebastian Enache, directorul executiv al Wind Power Energy (companie membra a Monsson Group) a sustinut prezentarea “Wind Farm Facility Management Solutions: Operation, Security and Dispatch” in cadrul Romanian Wind Energy Forum 2012. Compania Wind Power Energy  (WPE) are peste 115 clienti activi si peste 35 de parteneri. WPE este principala companie de consultanta in...
02:09 / 26-09-12
Ion Lungu, care se ocupa practic de tot ce inseamna tranzactii cu energie in CEZ Romania, structura care cuprinde mai multe companii organizata dupa ce grupul ceh de utilitati ceh a participat la Romanian Wind Energy Forum 2012. Ion Lungu a discutat despre piata de energie din...
01:57 / 26-09-12
Remus Cernea, preşedintele partidului Mişcarea Verzilor – Democraţi Agrarieni a participat la Romanian Wind Energy Forum 2012. Mişcarea Verzilor – Democraţi Agrarieni este un partid nou care isi propune sa aduca în prim planul dezbaterilor publice, printre multe altele, teme care privesc protecţia mediului, apărarea drepturilor şi libertăţilor fundamentale ale omului,...
20:26 / 25-09-12
ROMANIAN WIND ENERGY FORUM 2012, Constanta, 5-7 September – Organized by the Romanian Wind Energy Association with the support of the European Wind Energy Association RWEA initiated the organization of the first forum in Romania devoted exclusively to the wind industry with the support of EWEA. Foto...
14:30 / 15-09-12
Leading coatings manufacturer Hempel announced today the release of Hempadur Multi-Strength 35460, a new solvent-free version of its best-selling protective coating for offshore wind turbine foundations. As well as helping wind turbine manufacturers reduce solvent emissions, the new coating offers a six-hour drying time, one of the fastest in the industry...
14:19 / 15-09-12
“The whole Romanian Wind industry turned up –  well done.“ Continental Wind Partners (attendee at Wind Power Romania 2012) Wind Power Romania is the largest event dedicated to the growth of the Romanian wind industry. The 3rd Annual event will host more than 400 attendees in January – make sure you join...
23:16 / 11-09-12
The Switch has been selected as one of the 30 finalists of the 2012 Global Cleantech Later Stage Award organised by the Global Cleantech Cluster Association (GCCA). Along with Eniram and Forchem, two other Finnish companies, The Switch leads a list of more than 4,500 cleantech companies. The competition has been created by...
22:48 / 10-09-12
A doua editie a Romanian Wind Energy Forum 2012 (RWEF), eveniment organizat de Asociatia Romana pentru Energie Eoliana (RWEA) a avut loc la Constanta intre 5-7 septembrie 2012. La eveniment au participat peste 200 de reprezentanti implicati in industria energiei eoliene de la oficiali de la cel mai inalt nivel, reprezentanti...
22:17 / 10-09-12
RWEF 2012 | ROMANIAN WIND ENERGY FORUM 2012, Constanta, 5-7 September Organized by the Romanian Wind Energy Association with the support of the European Wind Energy Association RWEA initiated in 2011 the organization of the first forum in Romania devoted exclusively to the wind industry with the support of EWEA....
21:06 / 29-08-12
 The 4th Annual Wind Power Turkey Congress Wind Power Turkey, the premier Turkish wind energy event, has become the official meeting place for Turkish and international wind industry leaders, who recognise the potential growth and opportunity for the wind power industry in Turkey. Held as part of the Turkish International Renewable...
16:53 / 17-08-12
Asociaţia Oamenilor de Afaceri din România (AOAR) consideră oportună taxarea profiturilor excepţionale ale companiilor din sectorul energetic şi propune ca veniturile rezultate să constituie surse pentru un Fond Strategic de Dezvoltare destinat stimulării proiectelor de creştere a eficienţei energetice, se arată într-un comunicat AOAR, remis joi. ‘Asociaţia Oamenilor de Afaceri...
11:12 / 28-07-12
In June the Turkish Economy Minister, Zafer Caglayan, reitierated Turkey’s power needs are growing at 6% per year. Wind power is expected to supply a proportion of this deficit and the country has put in a support system designed to encourage investment into the sector. This has resulted in numerous...
20:21 / 02-07-12
MORE Green Energy la INTERSOLAR, Munchen “120 de investitori, 22 de mandate, 2 tranzacții la un târg care a evidențiat interesul investitorilor internaționali pentru sectorul Fotovoltaic din România” More Green Energy, o companie românească de brokeraj și consultanță activă pe piața de Energie Regenerabilă, a participat cu succes și a promovat...
12:53 / 20-06-12
Investitorii austrieci sunt foarte interesaţi de sectorul energiilor regenerabile, precum şi de acordarea de consultanţă în vederea atragerii de către România a fondurilor europene nerambursabile, a declarat marţi, ministrul delegat pentru Mediul de afaceri, Lucian Isar, într-un eveniment referitor la piaţa de fuziuni şi achiziţii. ‘Investitorii austrieci sunt foarte interesaţi...
16:49 / 19-06-12
RoEnergy 2012, targul international de energii regenerabile si eficienta energetica in constructii, va avea loc in perioada 20-22 iunie la ROMAERO Baneasa in Bucuresti. Aflat la a patra editie in Romania, evenimentul va prezenta, in cadrul unor conferinte specializate, cele mai recente tehnologii din domeniul energiei solare, eoliene, microhidroenergiei, biomasei,...
02:41 / 13-06-12
România are o poziţie de lider absolut în Europa Centrală şi de Est în ceea ce priveşte producţia de energie eoliană, se afirmă într-un raport al Programului pentru conducere durabilă (Programme for Sustainability Leadership) pe lângă Universitatea din Cambridge şi al Centrului regional pentru cercetări în domeniul politicii energetice (REKK)...
15:46 / 01-06-12
Staţia conectează un parc eolian de 700 MW la reţeaua naţională de transport al energiei Bucureşti, 31 mai 2012 – ABB a finalizat  staţia de 400 kV Rahman, al cărei beneficiar este Transelectrica S.A. Statia de 400 kV cu izolatie in aer (AIS) care este amplasată în zona Tulcea pe...
14:10 / 30-05-12
La Conferinta Energia eoliana „Probleme actuale din energia eoliana”, din data de 20 iunie 2012, organizata in cadrul Targului international de energii regenerabile RoEnergy Bucuresti 2012, ROMAERO, vor fi abordate teme noi, de interes pentru jucatorii din acest domeniu, cu aplicabilitate practica evidenta, legate în special de operarea si finantarea...
12:17 / 12-05-12
Romania urca pentru prima data in top 10 al celor mai atractive tari din lume privind investitiile in energie eoliana, conform ultimului raport Country Attractiveness Indices, lansat miercuri de Ernst & Young. Indicele calculat de Ernst & Young plaseaza Romania pe acelasi loc cu Polonia si Irlanda privind atractivitatea pietei...
17:28 / 12-04-12
Romanian wind energy market has proved a rapid growth towards reaching European targets; by the end of 2011, there were 982 MW installed in wind, already shaping the way to a cleaner environment and safer source of electricity. In order to keep the pace Romania needs a stable predictable legislation and an investor-friendly approach...
13:42 / 12-04-12
Transelectrica a semnat contracte de 10.000 MW capacităţi de producţie eoliene şi a acordat avize pentru alţi 10.000 MW, a declarat joi şeful Dispeceratului Energetic Naţional al Transelectrica, Marian Cernat, la o conferinţă privind energia regenerabilă. “Până în aprilie 2012 sunt semnate contracte pentru 10.000 MW instalaţi şi pentru încă...
08:23 / 20-03-12
Incepand din luna noiembrie producatorii de energie eoliana primesc cate 2 Certificate Verzi pentru fiecare MWh. Schema de sprijin va fi mentinuta pan ain 2017, iar din 2018 acestia vor primi cate 1 Certificat Verde. Acest sistem se desfasoara pe o perioada de 15 ani si este valabil doar pentru...
21:19 / 19-03-12
Producatorii de energie din surse regenerabile (E-SRE) au primit in luna ianuarie 2012 Certificate Verzi (CV) in valoare de circa 26,8 milioane de euro, in crestere cu 470% fata de perioada similara a anului trecut, cand valoarea certificatelor acordate insuma 4,7 milioane euro. Potrivit datelor Transelectrica, in prima luna a...
11:44 / 14-03-12
Enel Spa, cea mai mare companie de utilităţi din Italia, îşi va direcţiona investiţiile spre America Latină şi spre energia regenerabilă, deoarece recesiunea a afectat cererea de electricitate pe cea mai mare piaţă a companiei, transmite Bloomberg. ‘Creşterea trebuie să vină din energie regenerabilă şi din America Latină, precum şi...
19:15 / 29-02-12
România urcă pentru prima dată în top 10 al celor mai atractive ţări din lume privind investiţiile în energie eoliană, conform ultimului raport Country Attractiveness Indices, lansat astăzi de Ernst & Young. Acest avans reflectă cele mai noii investiţii în proiecte eoliene pe teritoriul ţării noastre, dintre care cea mai...
15:16 / 24-02-12
Peste 20 de turbine, dintr-un total de 40, au fost ridicate până acum în parcul eolian Iberdrola de la Mihai Viteazu. La final acesta va avea o putere instalată de 80 MW şi reprezintă doar prima etapă a investitiilor companiei spaniole în România. Pana acum sunt gata 22 de staţii,...
15:06 / 24-02-12
Omul de afaceri Valeriu Iftimie, patronul firmelor Elsaco Botoşani, a declarat că în toamna acestui an va fi demarată investiţia de 70 milioane de euro, constând într-un parc eolian, în zona comunei Mitoc. Acesta a declarat că investiţia va fi derulată împreună cu o firmă franco-germană. „În această toamnă vom...
17:07 / 23-02-12
Societatea Eolica Dobrogea a dat în judecată Autoritatea Naţională pentru Reglementare în Energie şi compania Transelectrica pentru refuzul de a încheia procesul verbal de îndeplinire a condiţiilor de racordare la reţea a parcului eolian de la Cogealac, judeţul Constanţa, potrivit informaţiilor transmise de Transelectrica Bursei de Valori Bucureşti. De asemenea,...
08:22 / 10-02-12
Romanian Wind Industry goes to the next level – A workshop organized by the Romanian Wind Energy Association Services dedicated to wind farm development in Romania | Targeted audience February 15, 2012 | Venue: Ramada Nord Hotel , 44 A Daniel Danielopolu St. English/Romanian interpretation provided With 982 MW currently installed, Romania...
20:40 / 06-02-12
Romania s-a clasat, anul trecut, pe primul loc in randul statelor emergente din UE dupa cresterea capacitatii instalate a parcurilor eoliene, situandu-se, totodata, pe locul 7 la acest capitol la nivelul intregii Uniuni, potrivit unui raport al Asociatiei Europene a Energiei Eoliene (European Wind Energy Association – EWEA). In Romania s-au instalat...
19:35 / 06-02-12
Compania poloneză Enterprise Investors a lansat un vehicul de investiţii prin care va aloca în câţiva ani 40 milioane de euro pentru construcţia de parcuri eoliene, în primă fază în Polonia, care poate fi urmată de extinderea activităţii pe alte pieţe din Europa Centrală şi de Est, în special în...
18:28 / 06-02-12
Corporaţia Financiară Internaţională (CFI), membră a grupului Băncii Mondiale, investeşte în producerea energiei regenerabile în Moldova, în particular, cea eoliană. Potrivit informaţiilor oferite cotidianului NOI.md din Republica Moldovade către reprezentanţi ai Ministerului Economiei, intenţia a fost anunţată în cadrul întrevederii reprezentanţilor Corporaţiei Financiare Internaţionale cu viceprim-ministrul Valeriu Lazăr, ministrul Economiei....
13:53 / 01-02-12
Siemens va livra si va instala 21 de turbine de cate 2,4 MW in primul parc eolian al GDF SUEZ în România. Parcul eolian construit de GDF SUEZ si Siemens va avea o capacitate instalată de 48 MW (echivalentul unui consum anual a circa 50.000 de gospodării din România). Potrivit...
13:38 / 01-02-12
GDF SUEZ Energy Romania a anuntat astazi decizia de a construi un prim parc eolian in Romania. Cel mai mare producător independent de electricitate şi operator în sectorul utilităţilor în ceea ce priveşte cifra de afaceri la nivel mondial, Grupul GDF SUEZ are un portofoliu diversificat şi echilibrat de active...
13:29 / 01-02-12
GDF SUEZ Energy România anunţă decizia de construcţie a unui parc eolian în România. Proiectul, localizat în comuna Gemenele, judeţul Brăila, a fost achiziţionat recent de la compania Belrom, un dezvoltator din domeniul imobiliar, se arata intr-un comunicat remis catre EnergieLive.ro. Primul parc eolian al GDF SUEZ în România va...
01:58 / 01-02-12
Electrica a anulat licitaţiile pentru achiziţia de turbine generatoare pentru parcurile eoliene Frumuşiţa din judeţul Galaţi şi Chirnogeni din Constanţa, deoarece ofertele nu au prevăzut în totalitate condiţiile tehnice de racordare la sistemul energetic ori nu s-au încadrat în rigorile modului de prezentare a preţului total ofertat, potrivit unui comunicat...
19:48 / 26-01-12
Brăila se alătură celorlalte trei judeţe din Regiunea Sud- Est, Constanţa, Tulcea şi Galaţi, în care sunt dezvoltate investiţii în parcuri eoliene. Grupul francez Filasa International a achiziţionat trei proiecte de parcuri eoliene în judeţul Brăila, „Wind Energy Power Trade”, „Wind Energy Advance Tech” şi „Wind Energy Strategy”, cu o...
18:11 / 26-01-12
Pentru a evalua validitatea pe termen mediu, respectiv pina in 2030, a actualelor obiective ale politicilor de promovare a surselor regenerabile de energie, Comisia Europeana a lansat, in decembrie 2011, o consultare publica avand ca scop aflarea opiniei partilor interesate pe aceasta tema, transmite Ministerul Industriilor. Avand in vedere obiectivul...
20:47 / 25-01-12
Cea de-a doua editie a Conferintei WIND POWER ROMANIA a avut loc intre 17-18 ianuarie 2012, la Bucuresti, la JW Marriott Hotel, si se bucura de intregul suport al Asociatiei Romane pentru Energie Eoliana (RWEA). Organizator este Green Power Conference din Marea Britanie. Conferinta a inceput in aceasta dimineata, cuvantul...
20:33 / 25-01-12
Parcul eolian de la Pantelimon construit de Monsson Group si Vestas va fi gata in vara lui 2012, a declarat Sebastian Enache, directorul Wind Power Energy Romania in cadrul expozitiei gazduite de WIND POWER ROMANIA. Cea de-a doua editie a Conferintei WIND POWER ROMANIA a avut loc intre 17-18 ianuarie 2012,...
14:00 / 25-01-12
Dobrogea este o mina de aur din punct de vedere energetic pentru Romania, pentru ca aici vantul bate, fara incetare, timp de 11 luni pe an. Specialistii afirma ca daca potentialul eolian al Dobrogei ar fi exploatat la intreaga sa capacitate ar putea fi obtinuta, fara prea mari eforturi, o...
14:35 / 24-01-12
Iberdrola, lider mondial în energia regenerabilă, a anuntat ca in luna martie anul acesta ar putea finaliza lucrările la prima investiţie din România, un parc eolian de 80 MW localizat în comuna Mihai Viteazu din Constanţa. “Din cele 40 de turbine de 2 MW fiecare pe care proiectul le presupune,...
14:12 / 24-01-12
După ce anul trecut Energias de Portugal (EDP) a terminat lucrările la trei parcuri eoliene în zona Dobrogei, unul de 90 MW la Peştera şi două de câte 69 MW în Cernavodă, grupul portughez spune că în februarie va mai finaliza două investiţii, una dintre ele fiind amplasată în regiunea...
18:02 / 17-01-12
Wind Power Romania 2012 features the very companies and organisations building, operating, financing and advising Romanian wind farms, organisations such as CEZ, Iberdrola, Enel, Continental Wind Partners, Verbund, Prowind, GE, Siemens or REpower. Key government officials from OPCOM  (the market operator), ANRE (the market regulator), the Ministry of the Economy and the Romanian Competition Council not to mention key wind turbine manufactuers such as GE, Siemens and REpower as the...
17:48 / 17-01-12
17 – 18 Ian 2012 – Hotel Marriott – Calea 13 Septembrie nr. 90, Bucuresti, Romania Cea de-a doua editie a Conferintei WIND POWER ROMANIA are loc intre 17-18 ianuarie 2012, la Bucuresti, la JW Marriott Hotel, si se bucura de intregul suport al Asociatiei Romane pentru Energie Eoliana (RWEA). Organizator...
17:18 / 16-01-12
În 2013, capacitatea instalată a turbinelor eoliene va ajunge la 2500 – 3000 MW, mai mult decât Austria sau Grecia, estimează consultantul Asociației Române pentru Energie Eoliană (AREE), Ionel David. “La finele anului 2013 estimăm o capacitate instalată cuprinsă între 2.500 și 3.000 MW. În 2013 vom depăși țări ca...
16:44 / 16-01-12
“Wind Power Energy companie membra a Monsson Group se va ocupa de balizarea luminoasa a turbinelor, monitorizarea video si instalarea sistemelor de securitate” a declarat Sebastian Enache, Managing Director al WPE pentru EnergieLive.ro. Investitia pentru parcul eolian Pantelimon de 150 MW, localizat în nordul judeţului Constanţa se va ridica la 250...
16:32 / 16-01-12
Monsson Group a anunţat demararea construcţiei la Parcul eolian Pantelimon de 150 MW, localizat în nordul judeţului Constanţa. Potrivit companiei, aproximativ 250 de milioane de euro vor fi investite pentru dezvoltarea fermei eoliene. „Când construcţia noului parc eolian va fi finalizată, cel mai probabil în vara anului 2012, acesta va produce electricitate...
16:22 / 16-01-12
Monsson Group, dezvoltator privat de parcuri eoliene cu un portofoliu de proiecte cu o capacitate totală de 2.400 MW, anunţă demararea construcţiei la Parcul eolian Pantelimon de 150 MW, localizat în nordul judeţului Constanţa. Potrivit unui comunicat al companiei, aproximativ 250 de milioane de euro vor fi investite pentru dezvoltarea...
17:38 / 13-01-12
Investitia in 25 deturbine eoliene pe virful Budacu, va insuma 75 milioane de euro, transmite Monitorul de Neamt. Locuri de munca, energie verde, foarte multi bani din partea unor investitori – toate acestea sint deja in curs de finalizare in localitatea Borca. Un grup de firme, in parteneriat cu Primaria...
17:33 / 13-01-12
Judeţul Galaţi are programată pentru anul 2012 realizarea a 30 de proiecte eoliene pentru care au fost încheiate contracte de racordare, cu o putere totală instalată de peste 387 MW, potrivit datelor furnizate de FDEE Electrica Distribuţie Muntenia Nord SA si citate de BizLayer. Astfel, în comuna Frumuşiţa sunt programate...





Romanian Energy Forum - Opinii & Idei:


Vasile Iuga

Iulian Chifu

Claudiu Cercel

Radu Dudau

Marius Stoian

Alexandru Grumaz

Razvan Nicolescu

Ionel Nitu

Alexandra Gatej

Dan Dungaciu

Marcel Foca




FAN COURIER
Wind Power Energy | Energie eoliana in Romania: 4.jpg


Prognoza METEO si de productie in Dobrogea:



Energie Eoliana: Servicii de consultanta |Service si Mentenanta | Sonometrie | Prognoza de productie

Romanian Energy Forum - www.energy-forum.ro

STIRI - DEPARTAMENTUL PENTRU ENERGIE:

» Elena Popescu(Departamentul pentru Energie): Este important ca România să devină producător de energie
România are resurse locale energetice extraordinare și de aceea este foarte important să nu mai rămână doar o țară de tranzit în regiunea citeste tot...
» Razvan Nicolescu: Livrarile de gaze din Romania sunt la nivel normal pentru acest moment
Livrările de gaze din Federația Rusă către România au revenit, sâmbătă, la nivelul normal, însă Gazprom nu a confirmat faptul că citeste tot...
» Companiile romanesti doresc preluarea unei parti din activitatile Enel Romania
Există interes din partea unor companii românești de stat să preia o parte din activitățile din România ale Enel, pe care compania italiană a citeste tot...
» Companiile de stat vor fi obligate sa intocmeasca strategii de dezvoltare pentru cel putin 10 ani
Companiile de stat aflate în subordinea Departamentului pentru Energie vor fi obligate să realizeze strategii de dezvoltare valabile pentru cel citeste tot...
» O parte din productia de gaze va fi comercializata obligatoriu pe o piata centralizata
Departamentul pentru Energie a inițiat un proiect de lege pentru modificarea Legii energiei electrice și a gazelor naturale nr. 123/2012, astfel citeste tot...

EVENIMENTE - ENERGY EVENTS in Romania

» David Whitfield: Uniunea Europeană impune creșterea eficienței centralelor termice pentru locuințe. Ce soluții are România?
22 aprilie 2015, București – Evinox Energy, companie britanică care activează de peste 12 ani pe piața britanică a sistemelor și citeste tot...
» Grupul MOL a lansat PIMS Academy 2015, oferind absolvenților români șansa de a deveni experți în optimizarea proceselor din industria petrolieră
Grupul MOL a lansat PIMS Academy 2015, oferind absolvenților români șansa de a deveni experți în optimizarea proceselor din industria petrolieră citeste tot...
» Parteneriat între Institutul român de Fizică Atomică și Comisariatul francez pentru Energie Atomică
Un nou acord de parteneriat între Institutul român de Fizică Atomică (IFA) și Comisariatul francez pentru Energie Atomică (CEA) a fost semnat, citeste tot...
» Eficiența Energetică în Vestul României: Eficiența Energetică în Clădiri și Industrie
Alături de energia produsă din surse regenerabile, România are un potențial uriaș în sectorul eficienței energetice, fie că vorbim despre citeste tot...
» Eveniment recomandat: Focus on Energy, pe 16 iunie
Schimbarile catre care tinde piata energiei din Romania vor fi analizate in detaliu pe 16 iunie, in cadrul evenimentului Focus on Energy, organizat de citeste tot...
» Peste 3 saptamani, Targul RoEnergy Bucuresti va asteapta cu firme din Germania, Spania, Italia Grecia, Bulgaria si multe noutati
In ciuda instabilitatii legislative din ultima vreme, pana in prezent, 2014 a adus foarte multe proiecte racordate la retea. Cumva pe tacute, parca citeste tot...
» Deutsche Telekom promoveaza “Smart Energy” la concursul international “Telekom Innovation Contest”
Săptămâna aceasta au început înscrierile pentru a doua ediție a concursului internațional „Telekom Innovation Contest”, dedicat în special citeste tot...
» RoEnergy Bucuresti ( 11-13 iunie 2014 ): Intr-o Europa fara gaze, Romania poate castiga din exportul Regenerabilelor
Recentele evenimente politice internationale, cu efecte directe asupra pietii energiei, readuc in discutiestrategiile tarilor europene in ceea ce citeste tot...
» Gala Premiilor din Energie are loc anul acesta pe 8 Mai, in Bucuresti
Publicatia The Diplomat-Bucharest are onoarea sa va anunte organizarea celei de-a treia editii anuale a galei de premii de excelenta in energie citeste tot...
» Aspecte juridice și practice pentru dezvoltarea energiei regenerabile în România între 9-11 aprilie, la Expo Arad International
Cea de-a VI-a edtie a ENERG Energia Regenerabila, cel mai mare targ pe energie regenerabila si eficienta energetica din triunghiul de frontiera citeste tot...

JOBURI



EVENIMENTE | ENERGY EVENTS we support:


Thermal Energy Forum

ROEC

Romanian Energy Awards

RoEnergy

Enreg Expo

CONTACT US:


Contact EnergieLive.ro

Power hosting by Appnor

Power hosting by Appnor

Arhiva EnergieLive.ro: June 2015 May 2015 April 2015 February 2015 January 2015 December 2014 November 2014 October 2014 September 2014 August 2014
---------------------------------------------------------------------------------------------------------------- Arhiva pe ani - stiri din energie: 2015 2014 2013 2012 2011 2010 2009

 

www.EnergieLive.ro - Portal Business 2 Business pentru industria de energie din Romania | Parte a BusinessLive.ro

Un proiect non-guvernamental dezvoltat de CRSC Europe - Partener local: Romanian Energy Forum | Informatii de contact

 

Citeste si: